House construction cost with CLC blocks vs bricks 2020-2021
In previous video we gave a brief introduction about CLC (cellular lightweight concrete) blocks and we told that in coming video we will discuss about the cost of house construction if you intend to build your house using CLC blocks . We will also compare the CLC blocks house construction cost with the conventional method using bricks instead of CLC blocks. In this video we will be discussing following:
2020 HOUSE CONSTRUCTION COST GREY STRUCTURE PER SQFT & Lumpsum for:
10 Marla house without basement using normal brick structure
10 Marla house without basement using normal brick structure with frame structure
10 Marla house without basement using CLC blocks with frame structure
———————————————————————————-
10 Marla house with basement using normal brick structure
10 Marla house with basement using normal brick structure with frame structure
10 Marla house with basement using CLC blocks with frame structure
———————————————————————————-
1 Kanal house without basement using normal brick structure
1 Kanal house without basement using normal brick structure with frame structure
1 Kanal house without basement using CLC blocks with frame structure
———————————————————————————–
1 Kanal house with basement using normal brick structure
1 Kanal house with basement using normal brick structure with frame structure
1 Kanal house with basement using CLC blocks with frame structure
CLC block in Pakistan is being manufacture currently by Banu Mukhtar. In todays date current price of block is in the range of 190Rs/block – 225Rs/block and is available in three different sizes as told in our previous blog. Since CLC block is non load bearing product, to use this block the house needs to be constructed as frame structure where the load is on all columns and beams. In our previous costing videos, all our costings are based on brick structure houses. Frame structure construction is expensive as compared to brick structure due to more requirement of steel, concrete and formwork.
For estimated costs, sample houses considered are:
10 Marla with basement:
Basement 1000 sqft (Maximum possible)
Ground floor+first floor+rooftop mumtee 3400 sqft
Total 4400 sqft
10 Marla without basement:
Ground floor+first floor+rooftop mumtee
Total 3400 sqft
1 Kanal with basement:
Basement 2700 sqft (Maximum possible)
Ground floor+first floor+rooftop mumtee 5400 sqft
Total 8100 sqft
1 Kanal without basement:
Ground floor+first floor+rooftop mumtee
Total 5400 sqft
Incase if you want to use CLC block method for house construction, it is recommended that you complete the frame only first of the house, then at second stage block work can be carried out followed by plasters and then completing grey structure as shown in pictures below. CLC blocks doesn’t require curing before or after masonry as in the case of bricks where heavy curing is required.
Disclaimer:
• Possible ±5% Variation is possible in cost shown in video
• Rates applicable in and around LAHORE region only
• Skills required to achieve this cost:
o Past experience o Quality & honest labor
o Labor management skills
o Quality, timely & cost effective material procurement
• Factors such as construction inexperience, unusual covered areas, frequent wear & tears, fraudulent labor etc can effect this cost figure
• Hire professional company which will add a figure of 200 Rs/sq.ft minimum as margin.